SirStone
  • Joined on 2025-05-04
SirStone closed issue SirStone/SirRoboGarage#59 2026-08-22 20:33:09 +02:00
Campaign v2 readiness: implement approved levers
SirStone commented on issue SirStone/SirRoboGarage#59 2026-08-22 20:31:55 +02:00
Campaign v2 readiness: implement approved levers

Campaign v2 LAUNCHED — all levers shipped, acceptance met, ticket resolved

Levers: all five shipped — part 1 a07e530 (levers 3, 4→gate, 1), part 2 6fc01eb (lever 2 shaping; lever 5…

SirStone commented on issue SirStone/SirRoboGarage#59 2026-08-22 19:45:56 +02:00
Campaign v2 readiness: implement approved levers

Phase 2 complete — lever 2 (aggression/anti-ram shaping) + lever 5 status

Commit: 6fc01eb (part 1 was a07e530). 3 files, +98/−7.

Reward delta table (raw, pre-normalization)

SirStone commented on issue SirStone/SirRoboGarage#59 2026-08-22 18:59:27 +02:00
Campaign v2 readiness: implement approved levers

Phase 1 complete — levers 3, 4, 1 implemented (execution order per sign-off), commit a07e530 on research/goto-controller.

Lever 3 — loss instrumentation: sacUpdate already…

SirStone commented on issue SirStone/SirRoboGarage#59 2026-08-22 18:33:40 +02:00
Campaign v2 readiness: implement approved levers

Claiming this issue (self-assigned SirStone) for phase 1 of the v2-readiness work: levers 3 → 4 → 1 in one measurement-hygiene pass on research/goto-controller. Levers 2 and 5 follow in phase 2.

SirStone opened issue SirStone/SirRoboGarage#59 2026-08-22 18:33:32 +02:00
Campaign v2 readiness: implement approved levers
SirStone commented on issue SirStone/SirRoboGarage#57 2026-08-22 18:32:49 +02:00
Campaign verdict: notebook, results table, scale-or-not call

Human sign-off received (2026-08-22, late evening): ALL FIVE levers approved.

Execution order: 3 (loss instrumentation) → 4 (eval-mode training gate) → 1 (eval rotation + MA best-gating) → 2…

SirStone closed issue SirStone/SirRoboGarage#58 2026-08-22 14:42:00 +02:00
Campaign-v1 watch: eval-regression threshold fired — intervention deferred to verdict
SirStone commented on issue SirStone/SirRoboGarage#58 2026-08-22 14:41:52 +02:00
Campaign-v1 watch: eval-regression threshold fired — intervention deferred to verdict

Outcome recorded — superseded by the #57 resolution (comment 490). The deferral rationale held: intervening at shift-1 would have been knob-twiddling without loss visibility; instead the run…

SirStone closed issue SirStone/SirRoboGarage#57 2026-08-22 14:41:50 +02:00
Campaign verdict: notebook, results table, scale-or-not call
SirStone commented on issue SirStone/SirRoboGarage#57 2026-08-22 14:41:26 +02:00
Campaign verdict: notebook, results table, scale-or-not call

Resolution — Campaign verdict: RETUNE BEFORE SCALING

Campaign-v1 completed naturally at ~14:28 CEST 2026-08-22: banner >>> training complete: 2500 chunks, round_counter 38912, runtime…

SirStone commented on issue SirStone/SirRoboGarage#57 2026-08-22 14:38:32 +02:00
Campaign verdict: notebook, results table, scale-or-not call

Claimed for implementation (self-assigned as SirStone — MCP assignee field unreliable, this comment is the assignment record). Working on branch research/goto-controller. Campaign ended…

SirStone commented on issue SirStone/SirRoboGarage#56 2026-08-22 07:49:11 +02:00
Lock campaign-v1 config and launch overnight run

Ceiling extended by orchestrator decision (human mandate: no deadlines / let the budget complete): old kill = procedural monitor instruction only (campaign_notebook.md lines 41/110, epoch…

SirStone opened issue SirStone/SirRoboGarage#58 2026-08-22 07:14:15 +02:00
Campaign-v1 watch: eval-regression threshold fired — intervention deferred to verdict
SirStone closed issue SirStone/SirRoboGarage#56 2026-08-22 00:32:26 +02:00
Lock campaign-v1 config and launch overnight run
SirStone commented on issue SirStone/SirRoboGarage#56 2026-08-22 00:32:17 +02:00
Lock campaign-v1 config and launch overnight run

Resolution — campaign-v1 locked, launched, HEALTHY (commits 2f49cb2, 2653671, 4b64bf1)

Final locked config (verbatim, copy-pasteable)

cd /home/davide/Projects/SirRoboGarage/…
SirStone commented on issue SirStone/SirRoboGarage#56 2026-08-21 23:22:15 +02:00
Lock campaign-v1 config and launch overnight run

Claimed for implementation (self-assigned as SirStone — MCP assignee field unreliable, this comment is the assignment record). Working on branch research/goto-controller. Inputs: observability…

SirStone closed issue SirStone/SirRoboGarage#54 2026-08-21 23:20:18 +02:00
Build mirror-twin sparring partner + harness readiness check
SirStone commented on issue SirStone/SirRoboGarage#54 2026-08-21 23:20:11 +02:00
Build mirror-twin sparring partner + harness readiness check

Resolution — mirror-twin sparring partner + readiness check (commit 6a294ad)

Placement decision

Dropped a self-contained twin dir into the external sample-bots archive (`SAMPLE_BOTS_DIR…

SirStone closed issue SirStone/SirRoboGarage#55 2026-08-21 22:48:30 +02:00
Observability inventory: what can we watch mid-run?